Product Overview
The Vesgantti 10 Inch Multilayer Hybrid Twin Mattress - Multiple Sizes & Styles Available is a Mattresses product. It features 【posh hybrid design】certipur-us certified memory foam and 7-zone pocketed innerspring.
Key Features
- 【Posh Hybrid Design】CertiPUR-US certified memory foam and 7-zone pocketed innerspring hybrid construction. Provides adequate support, while also conforming to the body to better release pressure, offering a balanced sleep experience for all sleepers
- 【Ultra Quiet】The innerspring work independently of each other with better motion isolation, less noise and longer service life. Slow-rebound foam provides good cushioning pressure release, effectively absorbing sound and vibration, allowing you to sleep soundly all night
- 【Breathable Mattress】Vesgantti twin mattress designed with a breathable knitted fabric cover and multiple layers of foam to help enhance airflow circulation and dissipate body heat for a cool and comfortable sleeping environment
- 【Sleep Well】Vesgantti Hybrid Mattress offers a medium firm plush feel, Satisfies most people's sleep preferences, You can enjoy a comfortable sleep every night with the purchase of our mattresses
- 【Mattress In a Box】The mattress arrives compressed and rolled in a box for easy delivery and setup. Simply unbox, unroll, and let it expand to its full size within a few hours, but please allow 24-72 hours for it to fully expand
Why Choose the Vesgantti 10 Inch Multilayer Hybrid Twin Mattress - Multiple Sizes & Styles Available
The Vesgantti 10 Inch Multilayer Hybrid Twin Mattress - Multiple Sizes & Styles Available offers 【posh hybrid design】certipur-us certified memory foam and 7-zone and 【ultra quiet】the innerspring work independently of each other. These features make the Vesgantti 10 Inch Multilayer Hybrid Twin Mattress - Multiple Sizes & Styles Available a strong option in the Mattresses category.
Best For
The Vesgantti 10 Inch Multilayer Hybrid Twin Mattress - Multiple Sizes & Styles Available is best suited for: Breathable.
Quick Summary
The Vesgantti 10 Inch Multilayer Hybrid Twin Mattress - Multiple Sizes & Styles Available is a Mattresses product by Vesgantti. Brand: Vesgantti. Size: Twin. Product Dimensions: 75"L x 39"W x 10"Th. Top Style: Euro Top. Cover Material: Breathable Knit Fabric Blend. Price: $296.98.
Product Specifications
| Specification | Details |
|---|---|
| Brand | Vesgantti |
| Size | Twin |
| Product Dimensions | 75"L x 39"W x 10"Th |
| Top Style | Euro Top |
| Cover Material | Breathable Knit Fabric Blend |
| Number of Layers | 4 |
| Fill Material | Memory Foam |
| Special Feature | Breathable |
| Color | Grey |
| Coil Type | Pocketed Coil |
| Item Weight 47 Pounds | Item Firmness Description Medium Firm |