Vesgantti 106" Modular Sectional Sofa by Vesgantti

Vesgantti 106" Modular Sectional Sofa

$1,072.48
Sale price  $1,072.48 Regular price 
Skip to product information
Vesgantti 106" Modular Sectional Sofa by Vesgantti

Vesgantti 106" Modular Sectional Sofa

$1,072.48
Sale price  $1,072.48 Regular price 

Product Overview

The Vesgantti 106" Modular Sectional Sofa with Chaise is a Sofas & Couches product. It features comfortable support: expertly engineered with a high-density foam and spring.

Key Features

  • Comfortable Support: Expertly engineered with a high-density foam and spring system that delivers the perfect balance of plush softness and supportive structure—the integrated spring system provides lasting resilience and extended durability, while the memory foam delivers a sensation of cloud-like comfort. Designed for ultimate relaxation, the generous 28" seat depth, elevated back cushion and arcuate armrests create an inviting lounging oasis, while the spacious 58" chaise lounge offers ample room to stretch out. Thoughtfully incorporated ergonomic features ensure ideal support for prolonged sitting or reclining
  • Fully Modular Design: This modular sofa offers ultimate flexibility with a total width of 106". You can easily rearrange the couch pieces to fit different spaces and needs—Whether arranged in an L-shape or placed side by side, it effortlessly adapts to diverse needs—from creating a snug reading nook to hosting movie nights with friends, enjoying laid-back family moments, or converting into a convenient sofa bed for guests. The sectional sofa's spacious design and modular construction makes moving and rearraning a piece of cake
  • No Assembly Required: Vesgantti cloud sofa arrives tool-free and vacuum-packed for effortless setup. Simply unbox, allow it to expand for up to 72 hours, and it’s ready to enjoy! Our boneless cloud couch can be placed on either side for customizable comfort—start relaxing from the moment you get it. Note: Minor wrinkles are normal after compression, and cushions may take up to three days to fully regain their fluffiness
  • Available in 6 Color Options: Two premium fabrics include plush corduroy couch and luxurious chenille couch—both offering exceptional comfort, lasting durability, and easy upkeep. These skin-friendly, pet-resistant materials withstand scratching while maintaining their softness, perfect for families with children and pets. For added convenience, the removable throw pillow covers and back cushion covers are machine-washable, effortlessly blending style with practicality—ideal for anyone seeking a fresh, low-maintenance sectional couches for living room
  • Space-Savvy Modular Comfort: Engineered for space-conscious living, this versatile fluffy sofa adapts seamlessly to any environment—from compact apartments to family rooms and small living spaces. Its innovative legless, minimalist design fits various decor styles, making it a versatile addition to different living spaces. For convenient delivery, the foam couch ships in two separate boxes (which may arrive at different times). Your satisfaction is guaranteed—should the product not meet your expectations, our dedicated customer service team will promptly provide a satisfactory resolution

Why Choose the Vesgantti 106" Modular Sectional Sofa with Chaise

The Vesgantti 106" Modular Sectional Sofa with Chaise offers comfortable support: expertly engineered with a high-density foam and fully modular design: this modular sofa offers ultimate. These features make the Vesgantti 106" Modular Sectional Sofa with Chaise a strong option in the Sofas & Couches category.

Best For

The Vesgantti 106" Modular Sectional Sofa with Chaise is best suited for: Deep Seat, Fire Retardant, High-Density Foam with Spring, No Assembly Required, Scratch Resistant, ultimate relaxation, families with children and pets.

Quick Summary

The Vesgantti 106" Modular Sectional Sofa with Chaise is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: No. Seat Depth: 28 inches. Seat Height: 16.9 Inches. Weight Limit: 1000 Pounds. Price: $1072.48.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required No
Seat Depth 28 inches
Seat Height 16.9 Inches
Weight Limit 1000 Pounds
Product Dimensions 68.5"D x 106"W x 25.6"H
Item Weight 89 Pounds
Type Sectional
Color Corduroy - Beige
Special Feature Deep Seat, Fire Retardant, High-Density Foam with Spring, No Assembly Required, Scratch Resistant
Seating Capacity 4.0 Style Contemporary
Shape L-Shape Material High-Density Foam with Spring

You may also like