Product Overview
The Vesgantti 12 Inch Multilayer Hybrid California King Mattress - Multiple Sizes & Styles Available is a Mattresses product. It features 【posh hybrid design】certipur-us certified memory foam and 7-zone pocketed innerspring.
Key Features
- 【Posh Hybrid Design】CertiPUR-US certified memory foam and 7-zone pocketed innerspring hybrid construction. Provides adequate support, while also conforming to the body to better release pressure, offering a balanced sleep experience for all sleepers
- 【Ultra Quiet】The innerspring work independently of each other with better motion isolation, less noise and longer service life. Slow-rebound foam provides good cushioning pressure release, effectively absorbing sound and vibration, allowing you to sleep soundly all night
- 【Breathable Mattress】Vesgantti cal king mattress designed with a breathable knitted fabric cover and multiple layers of foam to help enhance airflow circulation and dissipate body heat for a cool and comfortable sleeping environment
- 【Sleep Well】Vesgantti Hybrid Mattress offers a medium firm plush feel, Satisfies most people's sleep preferences, You can enjoy a comfortable sleep every night with the purchase of our mattresses
- 【Mattress In a Box】The mattress arrives compressed and rolled in a box for easy delivery and setup. Simply unbox, unroll, and let it expand to its full size within a few hours, but please allow 24-72 hours for it to fully expand
Why Choose the Vesgantti 12 Inch Multilayer Hybrid California King Mattress - Multiple Sizes & Styles Available
The Vesgantti 12 Inch Multilayer Hybrid California King Mattress - Multiple Sizes & Styles Available offers 【posh hybrid design】certipur-us certified memory foam and 7-zone and 【ultra quiet】the innerspring work independently of each other. These features make the Vesgantti 12 Inch Multilayer Hybrid California King Mattress - Multiple Sizes & Styles Available a strong option in the Mattresses category.
Best For
The Vesgantti 12 Inch Multilayer Hybrid California King Mattress - Multiple Sizes & Styles Available is best suited for: Breathable.
Quick Summary
The Vesgantti 12 Inch Multilayer Hybrid California King Mattress - Multiple Sizes & Styles Available is a Mattresses product by Vesgantti. Brand: Vesgantti. Size: California King. Product Dimensions: 84"L x 72"W x 12"Th. Top Style: Tight Top. Cover Material: Knitted Fabric. Price: $560.98.
Product Specifications
| Specification | Details |
|---|---|
| Brand | Vesgantti |
| Size | California King |
| Product Dimensions | 84"L x 72"W x 12"Th |
| Top Style | Tight Top |
| Cover Material | Knitted Fabric |
| Number of Layers | 4 |
| Fill Material | Memory Foam |
| Special Feature | Breathable |
| Color | White |
| Coil Type | Encased Coil |
| Item Firmness Description Medium Firm | Construction Type Hybrid |