Product Overview
The Vesgantti Full Mattress 10 Inch Innerspring Multilayer Hybrid Full Mattresses - Ergonomic Design with Memory Foam and Pocket Spring Mattress Full Size is a Mattresses product. It features 【posh hybrid design】certipur-us certified memory foam and 7-zone pocketed innerspring.
Key Features
- 【Posh Hybrid Design】CertiPUR-US certified memory foam and 7-zone pocketed innerspring hybrid construction. Provides adequate support, while also conforming to the body to better release pressure, offering a balanced sleep experience for all sleepers
- 【Ultra Quiet】The innerspring work independently of each other with better motion isolation, less noise and longer service life. Slow-rebound foam provides good cushioning pressure release, effectively absorbing sound and vibration, allowing you to sleep soundly all night
- 【Breathable Mattress】Vesgantti full mattress designed with a breathable knitted fabric cover and multiple layers of foam to help enhance airflow circulation and dissipate body heat for a cool and comfortable sleeping environment
- 【Sleep Well】Vesgantti Hybrid Mattress offers a medium firm plush feel, Satisfies most people's sleep preferences, You can enjoy a comfortable sleep every night with the purchase of our mattresses
- 【Mattress In a Box】The mattress arrives compressed and rolled in a box for easy delivery and setup. Simply unbox, unroll, and let it expand to its full size within a few hours, but please allow 24-72 hours for it to fully expand
Why Choose the Vesgantti Full Mattress 10 Inch Innerspring Multilayer Hybrid Full Mattresses - Ergonomic Design with Memory Foam and Pocket Spring Mattress Full Size
The Vesgantti Full Mattress 10 Inch Innerspring Multilayer Hybrid Full Mattresses - Ergonomic Design with Memory Foam and Pocket Spring Mattress Full Size offers 【posh hybrid design】certipur-us certified memory foam and 7-zone and 【ultra quiet】the innerspring work independently of each other. These features make the Vesgantti Full Mattress 10 Inch Innerspring Multilayer Hybrid Full Mattresses - Ergonomic Design with Memory Foam and Pocket Spring Mattress Full Size a strong option in the Mattresses category.
Best For
The Vesgantti Full Mattress 10 Inch Innerspring Multilayer Hybrid Full Mattresses - Ergonomic Design with Memory Foam and Pocket Spring Mattress Full Size is best suited for: Breathable.
Quick Summary
The Vesgantti Full Mattress 10 Inch Innerspring Multilayer Hybrid Full Mattresses - Ergonomic Design with Memory Foam and Pocket Spring Mattress Full Size is a Mattresses product by Vesgantti. Brand: Vesgantti. Size: Full. Product Dimensions: 75"L x 54"W x 10"Th. Top Style: Euro Top. Cover Material: Polyester. Price: $362.98.
Product Specifications
| Specification | Details |
|---|---|
| Brand | Vesgantti |
| Size | Full |
| Product Dimensions | 75"L x 54"W x 10"Th |
| Top Style | Euro Top |
| Cover Material | Polyester |
| Number of Layers | 8 |
| Fill Material | Memory Foam |
| Special Feature | Breathable |
| Color | White |
| Coil Type | Pocketed Coil |
| Item Weight 65 Pounds | Item Firmness Description Medium Firm |