Product Overview
The Vesgantti Full Size Mattress is a Mattresses product. It features medium-firm feel: fully expanded 75*39*10 inch(lwh) approx. vesgantti luxury multi-layer.
Key Features
- Medium-Firm Feel: Fully expanded 75*39*10 inch(LWH) approx. Vesgantti luxury multi-layer foam and pocket spring support system provide medium firm yet comfortable feel. A great relief for those suffering from back and neck pains. Note: Please keep distance when opening the mattress from the plastic packing, as it may have a risk to hit back when restoring
- Individual Pocket Spring: Innovative zoned support system constructed by hundreds of individual pocketed stainless spring coils, each spring work independently to offer an all-over and even support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebra well, help adjust and correct your sleeping posture
- Breathable and Healthy: Designed with multi-layer foams, comfortable and breathable, providing good air circulation to dissipate sweat and moisture to keep body comfortable and dry when sleeping
- Ultra Quite: Due to the pocket spring + multi-layer foams design, this mattress can effectively absorb noise and vibration; No waken up caused by tossing and turning, no disturbing companion
- 【Vacuum Rolled Packed】- Delivery: vacuum sealed and neatly rolled in a box. Smaller size, easy to carry. Please allow 48 hours for the mattress to fully expand after unpacking. Thickness measurement tip: the distance from the height of the fully expanded foam to the bottom of the base.(Please note: once the mattress open and restore, it cannot be roll back again)
Why Choose the Vesgantti Full Size Mattress
The Vesgantti Full Size Mattress offers medium-firm feel: fully expanded 75*39*10 inch(lwh) approx. vesgantti and individual pocket spring: innovative zoned support system constructed. These features make the Vesgantti Full Size Mattress a strong option in the Mattresses category.
Best For
The Vesgantti Full Size Mattress is best suited for: Orthopedic, Pressure Relief, Breathable, Low Motion Transfer, Cooling.
Quick Summary
The Vesgantti Full Size Mattress is a Mattresses product by Vesgantti. Brand: Vesgantti. Size: Full. Product Dimensions: 75"L x 54"W x 10"Th. Top Style: Tight Top. Cover Material: Polyester. Price: $395.98.
Product Specifications
| Specification | Details |
|---|---|
| Brand | Vesgantti |
| Size | Full |
| Product Dimensions | 75"L x 54"W x 10"Th |
| Top Style | Tight Top |
| Cover Material | Polyester |
| Number of Layers | 2 |
| Fill Material | Memory Foam |
| Special Feature | Orthopedic, Pressure Relief, Breathable, Low Motion Transfer, Cooling |
| Color | White |
| Coil Type | Pocketed Coil |
| Item Weight 56.5 Pounds | Item Firmness Description Medium Firm |